Breakthrough Constructions — Project Estimator
Breakthrough Constructions
Project estimator
Step 1 of 9
Breakthrough Constructions

What are we pricing?

Pick your project and we'll walk through the details. Takes about two minutes, and you'll see a ballpark range at the end.

Choose a project to continue.
Bathroom

Which room?

Each space carries a different fixture list and a different run of plumbing and electrical work.

Choose a room to continue.
Bathroom

How far are we going?

This shapes everything downstream, from demolition through to the final coat of paint.

Choose a scope to continue.
Bathroom

Rough measurements?

Floor length and width. Close enough is fine — we measure properly on site.

Lengthm
Widthm
Floor area5.0 m²
Wall area— m²
Enter valid dimensions and choose a ceiling height.
Bathroom

How much tiling?

Coverage drives waterproofing, labour and supply. It's the single biggest lever on the final number.

Answer each of the four questions above to continue.
Bathroom

What's going in?

Tick everything you want included. Pick a quality tier underneath and we'll price the lot.

All fixtures supplied and installed by Breakthrough Constructions — vanity, basin, tapware, toilet, shower fittings and accessories.
Choose a quality tier to continue.
Bathroom

Moving any plumbing?

Leaving fixtures where they are is always the cheapest route.

Relocating a shower, bath, toilet or vanity can mean cutting the slab. That adds both cost and days on site, depending on what's moving and how far.
Choose an option to continue.
Bathroom

Underfloor heating?

An electric mat laid under the tiles. It's the upgrade people mention most after the job's done.

Add underfloor heating
Warm tiles from the moment you step in, running at roughly $175 per square metre supplied and installed. Cheap to run, and it adds real value to the house.
Outdoor

Deck or pergola?

Start with the main structure. We'll ask about pairing the other one at the end.

Choose a structure to continue.
Decking

What's there now?

This tells us how much preparation and demolition sits in front of the build.

Choose the scope to continue.
Decking

How's site access?

Getting the old deck out and the waste away is the part that varies most between jobs.

Choose an access level to continue.
Decking

How big is the deck?

A rough area in square metres. Not sure? Pick one of the common sizes and we'll measure up on site.

30m²
5 m²150 m²
Decking

What kind of board?

Three families, each with a different look, lifespan and maintenance load. You'll pick the specific board next.

Choose a material type to continue.
Decking

Which board?

Supply rates shown per square metre. Install labour is included in your estimate.

Indicative so far—
Choose a board to continue.
Decking

How high off the ground?

Height sets the subframe system, the footings, and whether balustrade is required by law.

Choose a height to continue.
Decking

The frame underneath

Based on your deck height, here's what we'd build it on — plus one upgrade worth thinking about.

—
—
—
—

For

Against

Decking

Do you need stairs?

Any deck raised off the ground needs at least one set to get down to the yard.

Choose a stairs option to continue.
Decking

Handrails or balustrade?

Anything over a metre high needs balustrade under the National Construction Code.

Choose a balustrade, or select "Not needed".
Pergola

What style?

The structure decides the engineering, the materials and most of the cost.

Choose a pergola type to continue.
Pergola

How big is the cover?

The covered footprint in square metres. We'll confirm it on site.

20m²
5 m²100 m²
Indicative so far—
One more thing

Want to add a pergola?

Most clients pair the two to get a covered entertaining area. We can carry a rough allowance into your estimate.

Add a pergola over your deck
A basic attached painted timber pergola over roughly 20m² usually adds $8,000 to $18,000 depending on size and finish.
Last step

Where do we send it?

Your details unlock the full breakdown. Ben will follow up to arrange a free site visit and a firm written quote.

Enter your first name and mobile so we can send the estimate through.
Ballpark estimate
—
Based on what you've told us. A firm written quote follows a free site visit, usually back with you inside 48 hours.
    1
    Free site visit and measure
    48h
    Written quote back to you
    5–8
    Days on site

    Book a consultation call with our team

    Pick a time that suits and we'll talk through your project, answer any questions, and line up a firm written quote.

    Choose a time
    This estimate is a guide and is not a formal quote. Final pricing depends on a site inspection, design scope, council requirements and material costs at the time of build. Prices include GST.